CEC is an integral part of the operations at Aronui Feedlot located near Dalby.
The feedlot, which is run by Australian Agricultural Company (AACo) is one of the largest in Australia with an average capacity of 17,000 head of cattle.
CEC was engaged by principal contractor Bilfinger Berger to undertake each grid installation and testing, installation and connection of construction power and cable ladder, and supply of materials including earth grid cable and conduit.